Two Synergy Units need to be installed for a complete 50kW or 66.6kW Synergy system. For a complete 90kW, 100kW, or 120kW Synergy system three Synergy Units are required. Powered by the unique pre-commissioning process for rapid system installation
Pre-commissioning feature for automated validation of system components and wiring during the site installation process and before grid connection
Easy 2-person installation with a lightweight, modular design (each inverter consists of 2 or 3 Synergy Units and one Synergy Manager)
Independent operation of each Synergy Unit enables higher uptime and easy serviceability
Built-in thermal sensors detect faulty wiring ensuring enhanced protection and safety
Built-in arc fault protection and optional rapid shutdown
Built-in PID mitigation for maximized system performance
Monitored* and field-replaceable surge protection devices, to better withstand surges caused by lightning or other events: integrated RS485 and Type 2 DC SPDs, optional Type 2 AC SPD
Optional integrated DC safety switch eliminates the need for external DC isolators
Built-in module-level monitoring with Ethernet or cellular communication for full system visibility
*Applicable only for DC and AC SPDs